Weeks 4 and 6: Field work and results

by Frank Huijgens

Boa tarde!

After the first guided tour around the campus in week 3 with Mr. Congolo, I started preparing drawings of the existing sewer network. But I quickly realized that this was a quite difficult job. Actually the only source available was the Master Plan for UEM campus made in 2004. During the first guided tour I saw a part of the network displayed in the Master Plan and after I went back on my own in week 4 with a pencil and paper I compared the sketches with the map – fortunately both were the same. But this network only covered around 50% of the buildings. I asked Mr. Congolo some questions during the guided tour around the campus and with his answers and assumptions I made a map of the sewer network of the other buildings. Continue reading